DESIGN + BUILDING CENTRAL HEATING INSTALLATION FOR SECONDARY SCHOOL I-VIII CLASSES, RAZVAD VILLAGE (2017)

Project Info
  • Construction Date: 2017
  • Location: Razvad
  • Category: Portofoliu (eng)
Project Details

For this project we develop the technical execution plan, built “from scratch” the boiler room, assembling 126 radiators, almost 1.3 km of copper trail, cascade assembly for three Immergas Victrix Pro 100 kW + automation.

More Project Details

Enter your keyword