Project Info
- Construction Date: 2017
- Location: Razvad
- Category: Portofoliu (eng)
Project Details
For this project we develop the technical execution plan, built “from scratch” the boiler room, assembling 126 radiators, almost 1.3 km of copper trail, cascade assembly for three Immergas Victrix Pro 100 kW + automation.